Suzlon Group-subsidiary REpower Systems SE has signed a contract with PNE Wind AG to deliver 54 offshore wind turbines. The 6M turbines, each with 6,150 kW of rated power, are intended for the Gode
Wind I wind farm. The project is based in the German North Sea, around 35 km north of the East Frisian Islands in the Exclusive Economic Zone of Germany. This is the largest-ever offshore project with REpower turbines and one of the world’s biggest open-sea projects with turbines in the multi-megawatt class.
The wind turbines are set to be installed and commissioned in 2015. At the Gode Wind I site, the water is between 28 and 34 meters deep.
....more info
Wind I wind farm. The project is based in the German North Sea, around 35 km north of the East Frisian Islands in the Exclusive Economic Zone of Germany. This is the largest-ever offshore project with REpower turbines and one of the world’s biggest open-sea projects with turbines in the multi-megawatt class.
The wind turbines are set to be installed and commissioned in 2015. At the Gode Wind I site, the water is between 28 and 34 meters deep.
....more info